Unmapped Dataworks

Unmapped Search

Dam · Limpopo · on the Steelpoort River

How full · 9 November 2026

De Hoop Dam

98.8% full

A week before: 99.8%. A year before: 98.7% (the ring on the bar).

Last week
99.8%
A year ago
98.7%
Holds when full
348.7 million m³
Holds now
344.5 million m³

Save the image

01

The level, week by week

Full

25 Aug 20259 Nov 2026

This yearA year earlier53 weekly readings, 80% to 110%
Show the numbers
How full it was in each weekly report: every figure
When or whatFigure
9 November 202698.8% full, a year earlier 98.7%
2 November 202699.8% full, a year earlier 98.5%
26 October 202699.8% full, a year earlier 98.7%
19 October 2026100% full, a year earlier 98.9%
12 October 2026100% full, a year earlier 99.2%
5 October 2026100.2% full, a year earlier 99.4%
31 August 2026100.1% full, a year earlier 100.2%
24 August 2026100.1% full, a year earlier 100.3%
17 August 2026100.2% full, a year earlier 100.4%
10 August 2026100.1% full, a year earlier 100.6%
3 August 2026100.1% full, a year earlier 100.3%
29 June 2026100.3% full, a year earlier 100.4%
22 June 2026100.4% full, a year earlier 100.4%
15 June 2026100.5% full, a year earlier 100.4%
8 June 2026100.5% full, a year earlier 100.5%
1 June 2026100.7% full, a year earlier 100.5%
25 May 2026100.7% full, a year earlier 100.5%
18 May 2026100.7% full, a year earlier 100.6%
11 May 2026101.1% full, a year earlier 100.7%
4 May 2026100.7% full, a year earlier 100.9%
20 April 2026100.7% full, a year earlier 101%
13 April 2026100.5% full, a year earlier 100.6%
6 April 2026100.9% full, a year earlier 100.7%
30 March 2026101.1% full, a year earlier 100.8%
16 March 2026100.9% full, a year earlier 100.8%
9 March 2026100.8% full, a year earlier 101.2%
2 March 2026100.4% full, a year earlier 100.9%
23 February 2026100.4% full, a year earlier 101.3%
16 February 2026100.4% full, a year earlier 100.6%
9 February 2026100.5% full, a year earlier 100.5%
2 February 2026100.8% full, a year earlier 100.4%
26 January 2026100.9% full, a year earlier 100.6%
19 January 2026101% full, a year earlier 101.4%
12 January 2026100.9% full, a year earlier 102.4%
5 January 2026101.5% full, a year earlier 100.4%
29 December 2025100.7% full, a year earlier 95.7%
15 December 2025100.8% full, a year earlier 93.4%
8 December 2025101% full, a year earlier 93.9%
1 December 2025101.8% full, a year earlier 94.4%
24 November 2025100.8% full, a year earlier 94.8%
17 November 202599.3% full, a year earlier 94.9%
10 November 202598.2% full, a year earlier 93.5%
3 November 202597.9% full, a year earlier 94%
27 October 202598.3% full, a year earlier 94.4%
20 October 202598.4% full, a year earlier 94.6%
13 October 202599% full, a year earlier 95%
6 October 202599.1% full, a year earlier 95.3%
29 September 202599.2% full, a year earlier 95.7%
22 September 202599.7% full, a year earlier 96.1%
15 September 202599.7% full, a year earlier 96.5%
8 September 2025100.1% full, a year earlier 96.8%
1 September 2025100.2% full, a year earlier 97.1%
25 August 2025100.3% full, a year earlier 97.4%

Source: Weekly State of Dams, 2026-11-09, Department of Water and Sanitation, station B4R007

02

Rain on the dam’s ward

Tallest 290 mm

Nov 2025: 182 mm, normal 125 mmDec 2025: 150 mm, normal 131 mmJan 2026: 290 mm, normal 147 mmFeb 2026: 53 mm, normal 104 mmMar 2026: 258 mm, normal 91 mmApr 2026: 140 mm, normal 54 mmMay 2026: 22 mm, normal 17 mmJun 2026: 5 mm, normal 6 mmJul 2026: 1 mm, normal 7 mmAug 2026: 25 mm, normal 10 mmSep 2026: 37 mm, normal 20 mmOct 2026: 4 mm, normal 74 mm

NDJFMAMJJASO

Rain that monthA normal month (1991 to 2020)Nov 2025 to Oct 2026
Show the numbers
Rain in Ward 30, Elias Motsoaledi, month by month, against a normal month: every figure
When or whatFigure
Nov 2025182 mm, normal 125 mm
Dec 2025150 mm, normal 131 mm
Jan 2026290 mm, normal 147 mm
Feb 202653 mm, normal 104 mm
Mar 2026258 mm, normal 91 mm
Apr 2026140 mm, normal 54 mm
May 202622 mm, normal 17 mm
Jun 20265 mm, normal 6 mm
Jul 20261 mm, normal 7 mm
Aug 202625 mm, normal 10 mm
Sep 202637 mm, normal 20 mm
Oct 20264 mm, normal 74 mm

9.2 mm of rain so far in November; a normal November has 125 mm. This is the rain on ward 30 of Elias Motsoaledi, the ward the dam lies in: not on its whole catchment, which we don’t hold. Rain upstream fills a dam, so the two don’t have to move together.

Modelled estimates from a weather reanalysis, averaged over the whole place: not readings from a weather station, and not a forecast. The weather model runs about five days behind the weather, so the newest day here is usually five to twelve days ago.

Source: ERA5-Land, Copernicus Climate Change Service. The weather there, day by day

03

Where it is

River
Steelpoort River
In
Limpopo
Holds when full
348.7 million m³
Holds now
344.5 million m³
Ward
ward 30 of Elias Motsoaledi

Towns nearby

The nearest towns in a straight line from the dam. Being near a dam doesn’t mean a town gets its water from it: we hold no link yet between dams and the towns they supply.

Position and towns: © OpenStreetMap contributors, ODbL 1.0.

04

From space

De Hoop Dam from space

From space on 1 Nov 2026, the water covered 55% of De Hoop Dam’s full outline (8.9 of 16.2 km²). That fits a dam about 84% full (our estimate). The Department of Water and Sanitation’s own figure for the week of 9 Nov 2026 is 98.8%.

Two ways to say how full De Hoop Dam is

DWS
98.8% full by volume
Weekly State of Dams, 9 Nov 2026
From space, by volume
about 84% full by volume (estimated from the area)
Our estimate, not DWS’s, 1 Nov 2026; how we estimate it
From space
55.1% of the full area covered
Sentinel-2, 1 Nov 2026

DWS measures how much water is stored (volume). From space we measure how much ground the water covers (area). A dam’s sides slope, so it is deep at the wall and shallow at the edges: as it empties, the deep water goes while the surface stays wide, so the area falls more slowly than the volume. The two numbers differ even when both are right. In the sketch the level has dropped to 60% of the depth (the dashed line is full): the water still spans 60% of the width and, in a bowl like this, covers about a third of the full area, yet holds only about a fifth of the water.

De Hoop Dam: area against volume, our estimate

0%50%100%40%70%100%12 Jan 2017: 85.1% of the area, about 92% by volume23 Mar 2017: 102.6% of the area, about 100% by volume2 Apr 2017: 101.9% of the area, about 100% by volume22 May 2017: 102.5% of the area, about 100% by volume1 Jun 2017: 102.1% of the area, about 100% by volume6 Jul 2017: 102.4% of the area, about 100% by volume15 Aug 2017: 102.1% of the area, about 100% by volume9 Sep 2017: 91.2% of the area, about 95% by volume19 Oct 2017: 55.9% of the area, about 83% by volume7 Jan 2018: 73.1% of the area, about 87% by volume6 Feb 2018: 67.7% of the area, about 86% by volume28 Mar 2018: 93.6% of the area, about 96% by volume27 Apr 2018: 97.2% of the area, about 98% by volume22 May 2018: 97.5% of the area, about 98% by volume6 Jun 2018: 96.9% of the area, about 98% by volume1 Jul 2018: 93.6% of the area, about 96% by volume20 Aug 2018: 93.8% of the area, about 96% by volume4 Sep 2018: 92.4% of the area, about 95% by volume13 Dec 2018: 51.7% of the area, about 83% by volume17 Jan 2019: 65.1% of the area, about 85% by volume26 Feb 2019: 93.0% of the area, about 96% by volume28 Mar 2019: 94.3% of the area, about 96% by volume27 Apr 2019: 95.2% of the area, about 97% by volume17 May 2019: 94.5% of the area, about 97% by volume11 Jun 2019: 94.7% of the area, about 97% by volume1 Jul 2019: 93.6% of the area, about 96% by volume5 Aug 2019: 91.1% of the area, about 95% by volume9 Sep 2019: 88.2% of the area, about 93% by volume4 Oct 2019: 78.5% of the area, about 89% by volume28 Nov 2019: 45.5% of the area, about 82% by volume26 Feb 2020: 98.7% of the area, about 99% by volume21 Apr 2020: 98.7% of the area, about 99% by volume11 May 2020: 100.1% of the area, about 100% by volume15 Jun 2020: 99.8% of the area, about 100% by volume5 Jul 2020: 100.7% of the area, about 100% by volume9 Aug 2020: 98.7% of the area, about 99% by volume23 Sep 2020: 85.4% of the area, about 92% by volume7 Nov 2020: 64.5% of the area, about 85% by volume27 Dec 2020: 86.2% of the area, about 92% by volume20 Feb 2021: 98.4% of the area, about 99% by volume27 Mar 2021: 100.6% of the area, about 100% by volume11 Apr 2021: 100.8% of the area, about 100% by volume11 May 2021: 101.5% of the area, about 100% by volume15 Jun 2021: 101.2% of the area, about 100% by volume30 Jul 2021: 100.0% of the area, about 100% by volume4 Aug 2021: 99.3% of the area, about 100% by volume3 Sep 2021: 98.2% of the area, about 99% by volume13 Oct 2021: 58.3% of the area, about 84% by volume21 Jan 2022: 85.0% of the area, about 92% by volume20 Feb 2022: 94.3% of the area, about 96% by volume7 Mar 2022: 99.7% of the area, about 100% by volume1 Apr 2022: 99.0% of the area, about 99% by volume6 May 2022: 100.9% of the area, about 100% by volume5 Jun 2022: 101.7% of the area, about 100% by volume5 Jul 2022: 102.4% of the area, about 100% by volume29 Aug 2022: 100.4% of the area, about 100% by volume3 Sep 2022: 100.9% of the area, about 100% by volume3 Oct 2022: 82.6% of the area, about 91% by volume2 Dec 2022: 72.1% of the area, about 87% by volume11 Jan 2023: 88.0% of the area, about 93% by volume5 Feb 2023: 99.8% of the area, about 100% by volume17 Mar 2023: 98.6% of the area, about 99% by volume21 Apr 2023: 99.1% of the area, about 99% by volume26 May 2023: 100.8% of the area, about 100% by volume5 Jun 2023: 100.7% of the area, about 100% by volume5 Jul 2023: 101.4% of the area, about 100% by volume14 Aug 2023: 100.2% of the area, about 100% by volume3 Sep 2023: 98.4% of the area, about 99% by volume3 Oct 2023: 98.4% of the area, about 99% by volume2 Dec 2023: 42.7% of the area, about 82% by volume21 Jan 2024: 94.1% of the area, about 96% by volume25 Feb 2024: 96.8% of the area, about 98% by volume16 Mar 2024: 97.5% of the area, about 98% by volume20 Apr 2024: 98.6% of the area, about 99% by volume5 May 2024: 99.3% of the area, about 100% by volume19 Jun 2024: 99.8% of the area, about 100% by volume14 Jul 2024: 98.9% of the area, about 99% by volume3 Aug 2024: 97.2% of the area, about 98% by volume2 Sep 2024: 97.3% of the area, about 98% by volume12 Oct 2024: 62.1% of the area, about 84% by volume30 Jan 2025: 95.9% of the area, about 97% by volume4 Feb 2025: 46.4% of the area, about 82% by volume6 Mar 2025: 95.8% of the area, about 97% by volume22 Apr 2025: 96.1% of the area, about 98% by volume10 May 2025: 99.4% of the area, about 100% by volume1 Jun 2025: 99.6% of the area, about 100% by volume29 Jul 2025: 99.9% of the area, about 100% by volume3 Aug 2025: 99.9% of the area, about 100% by volume2 Sep 2025: 96.8% of the area, about 98% by volume2 Oct 2025: 98.1% of the area, about 99% by volume1 Nov 2025: 74.1% of the area, about 87% by volume6 Dec 2025: 46.6% of the area, about 82% by volume7 Jan 2026: 69.6% of the area, about 86% by volume19 Feb 2026: 94.8% of the area, about 97% by volume1 Mar 2026: 91.4% of the area, about 95% by volume27 Apr 2026: 100.6% of the area, about 100% by volume10 May 2026: 100.4% of the area, about 100% by volume24 Jun 2026: 99.8% of the area, about 100% by volume9 Jul 2026: 99.8% of the area, about 100% by volume3 Aug 2026: 99.9% of the area, about 100% by volume2 Sep 2026: 98.0% of the area, about 99% by volume22 Oct 2026: 81.1% of the area, about 90% by volume1 Nov 2026: 59.2% of the area, about 84% by volumeShare of the full area covered
Up: estimated % full by volume. The line is the fitted curve; each dot a month seen from space. Contains modified Copernicus Sentinel data 2017-2026. Produced using Copernicus WorldDEM-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved.
Show the numbers
De Hoop Dam: the share of the full area covered against the estimated share of the full volume, with 103 months on the curve: every figure
When or whatFigure
12 Jan 201785.1% of the area, about 92% by volume
23 Mar 2017102.6% of the area, about 100% by volume
2 Apr 2017101.9% of the area, about 100% by volume
22 May 2017102.5% of the area, about 100% by volume
1 Jun 2017102.1% of the area, about 100% by volume
6 Jul 2017102.4% of the area, about 100% by volume
15 Aug 2017102.1% of the area, about 100% by volume
9 Sep 201791.2% of the area, about 95% by volume
19 Oct 201755.9% of the area, about 83% by volume
7 Jan 201873.1% of the area, about 87% by volume
6 Feb 201867.7% of the area, about 86% by volume
28 Mar 201893.6% of the area, about 96% by volume
27 Apr 201897.2% of the area, about 98% by volume
22 May 201897.5% of the area, about 98% by volume
6 Jun 201896.9% of the area, about 98% by volume
1 Jul 201893.6% of the area, about 96% by volume
20 Aug 201893.8% of the area, about 96% by volume
4 Sep 201892.4% of the area, about 95% by volume
13 Dec 201851.7% of the area, about 83% by volume
17 Jan 201965.1% of the area, about 85% by volume
26 Feb 201993.0% of the area, about 96% by volume
28 Mar 201994.3% of the area, about 96% by volume
27 Apr 201995.2% of the area, about 97% by volume
17 May 201994.5% of the area, about 97% by volume
11 Jun 201994.7% of the area, about 97% by volume
1 Jul 201993.6% of the area, about 96% by volume
5 Aug 201991.1% of the area, about 95% by volume
9 Sep 201988.2% of the area, about 93% by volume
4 Oct 201978.5% of the area, about 89% by volume
28 Nov 201945.5% of the area, about 82% by volume
26 Feb 202098.7% of the area, about 99% by volume
21 Apr 202098.7% of the area, about 99% by volume
11 May 2020100.1% of the area, about 100% by volume
15 Jun 202099.8% of the area, about 100% by volume
5 Jul 2020100.7% of the area, about 100% by volume
9 Aug 202098.7% of the area, about 99% by volume
23 Sep 202085.4% of the area, about 92% by volume
7 Nov 202064.5% of the area, about 85% by volume
27 Dec 202086.2% of the area, about 92% by volume
20 Feb 202198.4% of the area, about 99% by volume
27 Mar 2021100.6% of the area, about 100% by volume
11 Apr 2021100.8% of the area, about 100% by volume
11 May 2021101.5% of the area, about 100% by volume
15 Jun 2021101.2% of the area, about 100% by volume
30 Jul 2021100.0% of the area, about 100% by volume
4 Aug 202199.3% of the area, about 100% by volume
3 Sep 202198.2% of the area, about 99% by volume
13 Oct 202158.3% of the area, about 84% by volume
21 Jan 202285.0% of the area, about 92% by volume
20 Feb 202294.3% of the area, about 96% by volume
7 Mar 202299.7% of the area, about 100% by volume
1 Apr 202299.0% of the area, about 99% by volume
6 May 2022100.9% of the area, about 100% by volume
5 Jun 2022101.7% of the area, about 100% by volume
5 Jul 2022102.4% of the area, about 100% by volume
29 Aug 2022100.4% of the area, about 100% by volume
3 Sep 2022100.9% of the area, about 100% by volume
3 Oct 202282.6% of the area, about 91% by volume
2 Dec 202272.1% of the area, about 87% by volume
11 Jan 202388.0% of the area, about 93% by volume
5 Feb 202399.8% of the area, about 100% by volume
17 Mar 202398.6% of the area, about 99% by volume
21 Apr 202399.1% of the area, about 99% by volume
26 May 2023100.8% of the area, about 100% by volume
5 Jun 2023100.7% of the area, about 100% by volume
5 Jul 2023101.4% of the area, about 100% by volume
14 Aug 2023100.2% of the area, about 100% by volume
3 Sep 202398.4% of the area, about 99% by volume
3 Oct 202398.4% of the area, about 99% by volume
2 Dec 202342.7% of the area, about 82% by volume
21 Jan 202494.1% of the area, about 96% by volume
25 Feb 202496.8% of the area, about 98% by volume
16 Mar 202497.5% of the area, about 98% by volume
20 Apr 202498.6% of the area, about 99% by volume
5 May 202499.3% of the area, about 100% by volume
19 Jun 202499.8% of the area, about 100% by volume
14 Jul 202498.9% of the area, about 99% by volume
3 Aug 202497.2% of the area, about 98% by volume
2 Sep 202497.3% of the area, about 98% by volume
12 Oct 202462.1% of the area, about 84% by volume
30 Jan 202595.9% of the area, about 97% by volume
4 Feb 202546.4% of the area, about 82% by volume
6 Mar 202595.8% of the area, about 97% by volume
22 Apr 202596.1% of the area, about 98% by volume
10 May 202599.4% of the area, about 100% by volume
1 Jun 202599.6% of the area, about 100% by volume
29 Jul 202599.9% of the area, about 100% by volume
3 Aug 202599.9% of the area, about 100% by volume
2 Sep 202596.8% of the area, about 98% by volume
2 Oct 202598.1% of the area, about 99% by volume
1 Nov 202574.1% of the area, about 87% by volume
6 Dec 202546.6% of the area, about 82% by volume
7 Jan 202669.6% of the area, about 86% by volume
19 Feb 202694.8% of the area, about 97% by volume
1 Mar 202691.4% of the area, about 95% by volume
27 Apr 2026100.6% of the area, about 100% by volume
10 May 2026100.4% of the area, about 100% by volume
24 Jun 202699.8% of the area, about 100% by volume
9 Jul 202699.8% of the area, about 100% by volume
3 Aug 202699.9% of the area, about 100% by volume
2 Sep 202698.0% of the area, about 99% by volume
22 Oct 202681.1% of the area, about 90% by volume
1 Nov 202659.2% of the area, about 84% by volume
How we estimate % full by volume from space

For each month with a clear view we take the edge of the water seen by Sentinel-2 and read the height of the ground there from the Copernicus elevation model (GLO-30, 30 m). Heights against areas give the dam’s area-to-height curve, fitted as a smooth curve that only rises. The water held between two levels is the area added up over the height between them. Starting from full, with the full-supply capacity in our dam-levels records (348.7 million m³), the water lost down to a month’s level gives that month’s % full by volume. We show it only where the months spread over enough levels and the curve fits well (R² 0.8 or more); otherwise we say “not enough range yet”. The elevation model was made from radar passes in 2010 to 2015 and shows each lake as a flat surface at its level then, so below that level it has no heights: for many dams only the months near full can be used. This dam: 12 months fitted, R² 0.93, typical miss 0.69 km², shoreline heights 907.7 m to 914.1 m. An estimate, not a measurement: it can be several points off, and DWS’s figure comes from gauged levels.

Produced using Copernicus WorldDEM-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-30.

De Hoop Dam from space on 9 Sep 2019 De Hoop Dam from space on 1 Nov 2026 9 Sep 20191 Nov 2026
Contains modified Copernicus Sentinel data 2019, 2026. True colour, the same frame each time. The earlier picture is from 2019, the year with the least water seen from space since 2015 (the dam was completed in 2015, says OpenStreetMap) (89.8% of full on average).

One picture a year

Contains modified Copernicus Sentinel data 2017-2026. Landsat imagery courtesy of the U.S. Geological Survey; Digital Earth Africa (CC BY 4.0), modified. Before 2017 Landsat’s cloud-free picture of the whole year; from 2017 the clearest Sentinel-2 picture of the same season each year. Choose a picture to see it large.

De Hoop Dam: water seen from space and DWS’s level

Water area from space (% of the full footprint)DWS level (% of full supply volume)

The chart needs JavaScript.

The clearest picture of each month. Area is not volume: a dam’s sides slope, so its area falls more slowly than its volume. DWS: the department’s weekly State of Dams. Contains modified Copernicus Sentinel data 2017-2026.

De Hoop Dam: every clear look from space since 1984

Water area, each clear Landsat look (% of the full outline)DWS level (% of full supply volume)

The chart needs JavaScript.

Landsat imagery courtesy of the U.S. Geological Survey; Digital Earth Africa (CC BY 4.0), modified. Water Observations from Space for each Landsat look (Digital Earth Africa), counted inside its Digital Earth Africa Waterbodies outline (15.6 km², CC BY 4.0). A look counts when 90% of the outline was seen clearly: 436 of the 999 looks since 1984. Against Sentinel-2 on 38 days both saw it (at most 2 days apart): 24 of 38 within 5 points. Area is not volume. DWS: weekly State of Dams.
How we estimate % full from space, and how well it does for De Hoop Dam
  • No calibrated estimate yet: DWS's figure ranged only 1.9 points over these months (10 needed): the dam stayed near one level.
  • Radar for cloudy weeks. Sentinel-1 sees through cloud. From 1 Jan 2025, 57 of its 163 passes saw the whole footprint with a clear split between water and land (wind roughens water and makes it look like land; those passes are left out, and of the passes within three days of a report the largest water area is used). Scaled to Sentinel-2 on 15 days both saw the dam (× 0.95). Of DWS’s 79 weekly reports since then, 19 had a clear Sentinel-2 view within three days and 33 more only radar.
  • The footprint. 16.2 km² from Digital Earth Africa’s 40 years of water against 15.0 km² in OpenStreetMap’s outline; they overlap 91% (shared area over the area of either); 1.3 km² is in the footprint only and 0.2 km² in the outline only. 0.7 km² inside the outline that Landsat never saw clearly (steep slopes, shadow) is counted in.
  • Each reading. A month is used when at most 5% of the footprint is under cloud or has no data: in the 116 months used, a median of 100.0% of it was clear (the worst 96.0%).
  • Shoreline pixels. A 20 m pixel at the edge is partly water and partly land; it counts as water when the satellite’s classification says water, else not at all. In a typical month 6.5% of the water area is such edge pixels; half of that is the most the edge can move the area either way.
  • Water outside the footprint. None worth noting in the months used.

Area is turned into % full by volume on this dam’s own curve, so the estimate is ours, not DWS’s. It can be off where the water’s edge is hard to see (shallow, muddy or weedy margins) or at levels the curve hasn’t seen. Where DWS and the estimate differ by more than the band, the page says so, without saying which is right.

How we measure a dam from space

Every month since January 2017 the European Space Agency’s Sentinel-2 satellites have pictured it; we measure the water in the clearest picture of each month. Before that, the Landsat satellites, through Digital Earth Africa, give the water in every clear look since 1984 (436 looks) and a picture a year.

Over the year to the newest DWS report, DWS’s level moved up 3.1 points and the water area seen from space up 8.4 points of full.

The chart counts the pixels of Sentinel-2’s water class at 20 m in the clearest scene of each month (at most 5% of the dam hidden by cloud), inside the dam’s footprint from Digital Earth Africa’s 40 years of water (Digital Earth Africa Water Observations from Space, all-time summary 1984 to 2025 (CC BY 4.0), modified).

Measured from space by Unmapped Dataworks, not by DWS: the water is the satellites’ own water class (Sentinel-2 Level-2A scene classification; for Landsat, Digital Earth Africa’s Water Observations from Space) inside the dam’s footprint widened by 40 m: the ground Digital Earth Africa saw under water in at least 10% of its clear Landsat looks from 1984 to 2025, joined to the dam (16.2 km²; OpenStreetMap’s outline, which we use for the dam’s name and place, covers 15.0 km²; Landsat’s yearly water is still measured in OpenStreetMap’s outline), so shallow or muddy edges, floating plants and shadow can count wrong. 116 of 119 months had a clear view. Footprint: Digital Earth Africa Water Observations from Space, all-time summary 1984 to 2025 (CC BY 4.0), modified. The outline is OpenStreetMap’s (© OpenStreetMap contributors, ODbL; the outlines and how we match them). Pictures: Copernicus Sentinel data, free, full and open; Landsat courtesy of the U.S. Geological Survey, through Digital Earth Africa (CC BY 4.0). Radar: Contains modified Copernicus Sentinel data 2025-2026 (Sentinel-1 radar, processed by Digital Earth Africa).

Unmapped Dataworks