Unmapped Dataworks

Unmapped Search

Dam · Western Cape · on the Sanddrifskloof River

How full · 9 November 2026

Roode Els Berg Dam

98.2% full

A week before: 98.8%. A year before: 96.3% (the ring on the bar).

Last week
98.8%
A year ago
96.3%
Holds when full
7.8 million m³
Holds now
7.7 million m³

Save the image

01

The level, week by week

Full

25 Aug 20259 Nov 2026

This yearA year earlier53 weekly readings, 20% to 110%
Show the numbers
How full it was in each weekly report: every figure
When or whatFigure
9 November 202698.2% full, a year earlier 96.3%
2 November 202698.8% full, a year earlier 97.8%
26 October 202698.7% full, a year earlier 98.1%
19 October 202698.7% full, a year earlier 99.1%
12 October 2026100.1% full, a year earlier 99.7%
5 October 202698.3% full, a year earlier 100%
31 August 202698.2% full, a year earlier 100.2%
24 August 202699.3% full, a year earlier 100.3%
17 August 202697.2% full, a year earlier 100.2%
10 August 202697.7% full, a year earlier 99.9%
3 August 202697.4% full, a year earlier 90.1%
29 June 202697.4% full, a year earlier 45.5%
22 June 202697.7% full, a year earlier 34.1%
15 June 202697.7% full, a year earlier 31.3%
8 June 202697.5% full, a year earlier 28.5%
1 June 202697.6% full, a year earlier 26.6%
25 May 202696.7% full, a year earlier 26.5%
18 May 202697.5% full, a year earlier 28%
11 May 202631.8% full, a year earlier 29.2%
4 May 202626.1% full, a year earlier 31%
20 April 202626.7% full, a year earlier 33.8%
13 April 202627.9% full, a year earlier 35.4%
6 April 202629.6% full, a year earlier 37.1%
30 March 202631.3% full, a year earlier 40.3%
16 March 202636.4% full, a year earlier 45.8%
9 March 202639.5% full, a year earlier 49%
2 March 202640.7% full, a year earlier 52.6%
23 February 202642.6% full, a year earlier 55.4%
16 February 202644.8% full, a year earlier 59.2%
9 February 202643.2% full, a year earlier 63.1%
2 February 202646.3% full, a year earlier 67.3%
26 January 202651% full, a year earlier 72.1%
19 January 202655.1% full, a year earlier 76.5%
12 January 202659.7% full, a year earlier 80.9%
5 January 202664.4% full, a year earlier 85.5%
29 December 202569.1% full, a year earlier 89.2%
15 December 202578.2% full, a year earlier 95.4%
8 December 202583.2% full, a year earlier 97.7%
1 December 202586.7% full, a year earlier 99%
24 November 202590% full, a year earlier 99.3%
17 November 202593.4% full, a year earlier 99.2%
10 November 202596.3% full, a year earlier 100.3%
3 November 202597.7% full, a year earlier 100.3%
27 October 202598.2% full, a year earlier 100.2%
20 October 202599.2% full, a year earlier 100.3%
13 October 202599.7% full, a year earlier 100.4%
6 October 2025100% full, a year earlier 100.4%
29 September 2025100% full, a year earlier 100.4%
22 September 2025100.1% full, a year earlier 100.4%
15 September 2025100.2% full, a year earlier 100.5%
8 September 2025100.3% full, a year earlier 100.5%
1 September 2025100.2% full, a year earlier 100.5%
25 August 2025100.3% full, a year earlier 100.5%

Source: Weekly State of Dams, 2026-11-09, Department of Water and Sanitation, station H2R001

02

Rain on the dam’s ward

Tallest 137 mm

Nov 2025: 9 mm, normal 31 mmDec 2025: 6 mm, normal 21 mmJan 2026: 3 mm, normal 17 mmFeb 2026: 65 mm, normal 17 mmMar 2026: 28 mm, normal 25 mmApr 2026: 69 mm, normal 33 mmMay 2026: 137 mm, normal 39 mmJun 2026: 46 mm, normal 59 mmJul 2026: 7 mm, normal 53 mmAug 2026: 21 mm, normal 47 mmSep 2026: 95 mm, normal 31 mmOct 2026: 19 mm, normal 31 mm

NDJFMAMJJASO

Rain that monthA normal month (1991 to 2020)Nov 2025 to Oct 2026
Show the numbers
Rain in Ward 4, Breede Valley, month by month, against a normal month: every figure
When or whatFigure
Nov 20259 mm, normal 31 mm
Dec 20256 mm, normal 21 mm
Jan 20263 mm, normal 17 mm
Feb 202665 mm, normal 17 mm
Mar 202628 mm, normal 25 mm
Apr 202669 mm, normal 33 mm
May 2026137 mm, normal 39 mm
Jun 202646 mm, normal 59 mm
Jul 20267 mm, normal 53 mm
Aug 202621 mm, normal 47 mm
Sep 202695 mm, normal 31 mm
Oct 202619 mm, normal 31 mm

1.0 mm of rain so far in November; a normal November has 31 mm. This is the rain on ward 4 of Breede Valley, the ward the dam lies in: not on its whole catchment, which we don’t hold. Rain upstream fills a dam, so the two don’t have to move together.

Modelled estimates from a weather reanalysis, averaged over the whole place: not readings from a weather station, and not a forecast. The weather model runs about five days behind the weather, so the newest day here is usually five to twelve days ago.

Source: ERA5-Land, Copernicus Climate Change Service. The weather there, day by day

03

Where it is

River
Sanddrifskloof River
In
Western Cape
Holds when full
7.8 million m³
Holds now
7.7 million m³
Ward
ward 4 of Breede Valley

Towns nearby

The nearest towns in a straight line from the dam. Being near a dam doesn’t mean a town gets its water from it: we hold no link yet between dams and the towns they supply.

Position and towns: © OpenStreetMap contributors, ODbL 1.0.

04

From space

Roode Els Berg Dam from space

From space on 10 Nov 2026, the water covered 36% of Roode Els Berg Dam’s full outline (0.13 of 0.37 km²). That fits a dam about 77% full (our estimate). The Department of Water and Sanitation’s own figure for the week of 9 Nov 2026 is 98.2%.

Two ways to say how full Roode Els Berg Dam is

DWS
98.2% full by volume
Weekly State of Dams, 9 Nov 2026
From space, by volume
about 77% full by volume (estimated from the area)
Our estimate, not DWS’s, 10 Nov 2026; how we estimate it
From space
35.5% of the full area covered
Sentinel-2, 10 Nov 2026

DWS measures how much water is stored (volume). From space we measure how much ground the water covers (area). A dam’s sides slope, so it is deep at the wall and shallow at the edges: as it empties, the deep water goes while the surface stays wide, so the area falls more slowly than the volume. The two numbers differ even when both are right. In the sketch the level has dropped to 60% of the depth (the dashed line is full): the water still spans 60% of the width and, in a bowl like this, covers about a third of the full area, yet holds only about a fifth of the water.

Roode Els Berg Dam: area against volume, our estimate

0%50%100%0%50%100%1 Jan 2017: 55.7% of the area, about 82% by volume10 Feb 2017: 42.5% of the area, about 78% by volume22 Mar 2017: 27.6% of the area, about 75% by volume11 Apr 2017: 36.9% of the area, about 77% by volume20 Jun 2017: 95.3% of the area, about 98% by volume30 Jul 2017: 26.4% of the area, about 75% by volume9 Aug 2017: 61.7% of the area, about 84% by volume18 Sep 2017: 40.5% of the area, about 78% by volume13 Oct 2017: 39.1% of the area, about 78% by volume27 Nov 2017: 27.8% of the area, about 75% by volume7 Dec 2017: 36.2% of the area, about 77% by volume11 Jan 2018: 26.1% of the area, about 75% by volume27 Mar 2018: 10.4% of the area, about 73% by volume21 Apr 2018: 26.0% of the area, about 75% by volume16 May 2018: 64.0% of the area, about 85% by volume5 Jun 2018: 100.6% of the area, about 100% by volume15 Jul 2018: 118.4% of the area, about 100% by volume9 Aug 2018: 35.5% of the area, about 77% by volume3 Sep 2018: 69.9% of the area, about 87% by volume8 Oct 2018: 71.4% of the area, about 87% by volume22 Nov 2018: 36.4% of the area, about 77% by volume17 Dec 2018: 54.8% of the area, about 82% by volume26 Jan 2019: 38.4% of the area, about 77% by volume25 Feb 2019: 38.3% of the area, about 77% by volume27 Mar 2019: 24.3% of the area, about 75% by volume6 Apr 2019: 18.1% of the area, about 74% by volume1 May 2019: 22.2% of the area, about 75% by volume15 Jul 2019: 36.7% of the area, about 77% by volume24 Aug 2019: 24.5% of the area, about 75% by volume8 Sep 2019: 32.2% of the area, about 76% by volume8 Oct 2019: 40.3% of the area, about 78% by volume22 Nov 2019: 32.1% of the area, about 76% by volume22 Dec 2019: 55.1% of the area, about 82% by volume11 Jan 2020: 26.0% of the area, about 75% by volume25 Feb 2020: 25.4% of the area, about 75% by volume21 Mar 2020: 23.3% of the area, about 75% by volume30 Apr 2020: 6.8% of the area, about 73% by volume24 Jul 2020: 6.7% of the area, about 73% by volume3 Aug 2020: 30.5% of the area, about 76% by volume7 Sep 2020: 41.8% of the area, about 78% by volume22 Oct 2020: 47.6% of the area, about 80% by volume1 Nov 2020: 34.1% of the area, about 77% by volume26 Dec 2020: 33.6% of the area, about 76% by volume25 Jan 2021: 31.3% of the area, about 76% by volume9 Feb 2021: 29.3% of the area, about 76% by volume6 Mar 2021: 36.7% of the area, about 77% by volume20 Apr 2021: 31.8% of the area, about 76% by volume10 May 2021: 29.3% of the area, about 76% by volume23 Aug 2021: 25.4% of the area, about 75% by volume22 Sep 2021: 46.8% of the area, about 79% by volume27 Oct 2021: 61.0% of the area, about 84% by volume11 Nov 2021: 46.9% of the area, about 79% by volume31 Dec 2021: 33.3% of the area, about 76% by volume30 Jan 2022: 31.2% of the area, about 76% by volume24 Feb 2022: 29.3% of the area, about 76% by volume6 Mar 2022: 27.6% of the area, about 75% by volume10 Apr 2022: 24.2% of the area, about 75% by volume15 May 2022: 6.8% of the area, about 73% by volume4 Jul 2022: 7.5% of the area, about 73% by volume23 Aug 2022: 24.0% of the area, about 75% by volume7 Sep 2022: 29.8% of the area, about 76% by volume2 Oct 2022: 25.8% of the area, about 75% by volume1 Nov 2022: 20.4% of the area, about 74% by volume21 Dec 2022: 16.2% of the area, about 74% by volume20 Jan 2023: 21.8% of the area, about 75% by volume9 Feb 2023: 18.8% of the area, about 74% by volume31 Mar 2023: 24.5% of the area, about 75% by volume5 Apr 2023: 25.7% of the area, about 75% by volume15 May 2023: 10.6% of the area, about 73% by volume24 Jul 2023: 14.9% of the area, about 74% by volume3 Aug 2023: 17.4% of the area, about 74% by volume27 Sep 2023: 34.2% of the area, about 77% by volume2 Oct 2023: 35.5% of the area, about 77% by volume26 Nov 2023: 32.9% of the area, about 76% by volume11 Dec 2023: 33.1% of the area, about 76% by volume20 Jan 2024: 32.3% of the area, about 76% by volume19 Feb 2024: 29.5% of the area, about 76% by volume30 Mar 2024: 29.9% of the area, about 76% by volume29 Apr 2024: 12.8% of the area, about 74% by volume14 May 2024: 8.7% of the area, about 73% by volume23 Jul 2024: 8.8% of the area, about 73% by volume11 Sep 2024: 39.3% of the area, about 78% by volume16 Oct 2024: 34.7% of the area, about 77% by volume15 Nov 2024: 33.7% of the area, about 76% by volume25 Dec 2024: 31.2% of the area, about 76% by volume24 Jan 2025: 32.1% of the area, about 76% by volume3 Feb 2025: 31.1% of the area, about 76% by volume15 Mar 2025: 26.8% of the area, about 75% by volume4 Apr 2025: 24.1% of the area, about 75% by volume4 May 2025: 10.5% of the area, about 73% by volume28 Jul 2025: 10.6% of the area, about 73% by volume2 Aug 2025: 11.2% of the area, about 73% by volume6 Sep 2025: 40.9% of the area, about 78% by volume21 Oct 2025: 35.2% of the area, about 77% by volume7 Nov 2025: 33.3% of the area, about 76% by volume20 Dec 2025: 9.6% of the area, about 73% by volume19 Jan 2026: 27.6% of the area, about 75% by volume18 Feb 2026: 24.3% of the area, about 75% by volume15 Mar 2026: 22.1% of the area, about 75% by volume24 Apr 2026: 12.7% of the area, about 74% by volume16 May 2026: 11.7% of the area, about 74% by volume5 Jun 2026: 7.1% of the area, about 73% by volume2 Aug 2026: 11.4% of the area, about 74% by volume1 Sep 2026: 37.7% of the area, about 77% by volume11 Oct 2026: 34.8% of the area, about 77% by volume10 Nov 2026: 34.4% of the area, about 77% by volumeShare of the full area covered
Up: estimated % full by volume. The line is the fitted curve; each dot a month seen from space. Contains modified Copernicus Sentinel data 2017-2026. Produced using Copernicus WorldDEM-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved.
Show the numbers
Roode Els Berg Dam: the share of the full area covered against the estimated share of the full volume, with 106 months on the curve: every figure
When or whatFigure
1 Jan 201755.7% of the area, about 82% by volume
10 Feb 201742.5% of the area, about 78% by volume
22 Mar 201727.6% of the area, about 75% by volume
11 Apr 201736.9% of the area, about 77% by volume
20 Jun 201795.3% of the area, about 98% by volume
30 Jul 201726.4% of the area, about 75% by volume
9 Aug 201761.7% of the area, about 84% by volume
18 Sep 201740.5% of the area, about 78% by volume
13 Oct 201739.1% of the area, about 78% by volume
27 Nov 201727.8% of the area, about 75% by volume
7 Dec 201736.2% of the area, about 77% by volume
11 Jan 201826.1% of the area, about 75% by volume
27 Mar 201810.4% of the area, about 73% by volume
21 Apr 201826.0% of the area, about 75% by volume
16 May 201864.0% of the area, about 85% by volume
5 Jun 2018100.6% of the area, about 100% by volume
15 Jul 2018118.4% of the area, about 100% by volume
9 Aug 201835.5% of the area, about 77% by volume
3 Sep 201869.9% of the area, about 87% by volume
8 Oct 201871.4% of the area, about 87% by volume
22 Nov 201836.4% of the area, about 77% by volume
17 Dec 201854.8% of the area, about 82% by volume
26 Jan 201938.4% of the area, about 77% by volume
25 Feb 201938.3% of the area, about 77% by volume
27 Mar 201924.3% of the area, about 75% by volume
6 Apr 201918.1% of the area, about 74% by volume
1 May 201922.2% of the area, about 75% by volume
15 Jul 201936.7% of the area, about 77% by volume
24 Aug 201924.5% of the area, about 75% by volume
8 Sep 201932.2% of the area, about 76% by volume
8 Oct 201940.3% of the area, about 78% by volume
22 Nov 201932.1% of the area, about 76% by volume
22 Dec 201955.1% of the area, about 82% by volume
11 Jan 202026.0% of the area, about 75% by volume
25 Feb 202025.4% of the area, about 75% by volume
21 Mar 202023.3% of the area, about 75% by volume
30 Apr 20206.8% of the area, about 73% by volume
24 Jul 20206.7% of the area, about 73% by volume
3 Aug 202030.5% of the area, about 76% by volume
7 Sep 202041.8% of the area, about 78% by volume
22 Oct 202047.6% of the area, about 80% by volume
1 Nov 202034.1% of the area, about 77% by volume
26 Dec 202033.6% of the area, about 76% by volume
25 Jan 202131.3% of the area, about 76% by volume
9 Feb 202129.3% of the area, about 76% by volume
6 Mar 202136.7% of the area, about 77% by volume
20 Apr 202131.8% of the area, about 76% by volume
10 May 202129.3% of the area, about 76% by volume
23 Aug 202125.4% of the area, about 75% by volume
22 Sep 202146.8% of the area, about 79% by volume
27 Oct 202161.0% of the area, about 84% by volume
11 Nov 202146.9% of the area, about 79% by volume
31 Dec 202133.3% of the area, about 76% by volume
30 Jan 202231.2% of the area, about 76% by volume
24 Feb 202229.3% of the area, about 76% by volume
6 Mar 202227.6% of the area, about 75% by volume
10 Apr 202224.2% of the area, about 75% by volume
15 May 20226.8% of the area, about 73% by volume
4 Jul 20227.5% of the area, about 73% by volume
23 Aug 202224.0% of the area, about 75% by volume
7 Sep 202229.8% of the area, about 76% by volume
2 Oct 202225.8% of the area, about 75% by volume
1 Nov 202220.4% of the area, about 74% by volume
21 Dec 202216.2% of the area, about 74% by volume
20 Jan 202321.8% of the area, about 75% by volume
9 Feb 202318.8% of the area, about 74% by volume
31 Mar 202324.5% of the area, about 75% by volume
5 Apr 202325.7% of the area, about 75% by volume
15 May 202310.6% of the area, about 73% by volume
24 Jul 202314.9% of the area, about 74% by volume
3 Aug 202317.4% of the area, about 74% by volume
27 Sep 202334.2% of the area, about 77% by volume
2 Oct 202335.5% of the area, about 77% by volume
26 Nov 202332.9% of the area, about 76% by volume
11 Dec 202333.1% of the area, about 76% by volume
20 Jan 202432.3% of the area, about 76% by volume
19 Feb 202429.5% of the area, about 76% by volume
30 Mar 202429.9% of the area, about 76% by volume
29 Apr 202412.8% of the area, about 74% by volume
14 May 20248.7% of the area, about 73% by volume
23 Jul 20248.8% of the area, about 73% by volume
11 Sep 202439.3% of the area, about 78% by volume
16 Oct 202434.7% of the area, about 77% by volume
15 Nov 202433.7% of the area, about 76% by volume
25 Dec 202431.2% of the area, about 76% by volume
24 Jan 202532.1% of the area, about 76% by volume
3 Feb 202531.1% of the area, about 76% by volume
15 Mar 202526.8% of the area, about 75% by volume
4 Apr 202524.1% of the area, about 75% by volume
4 May 202510.5% of the area, about 73% by volume
28 Jul 202510.6% of the area, about 73% by volume
2 Aug 202511.2% of the area, about 73% by volume
6 Sep 202540.9% of the area, about 78% by volume
21 Oct 202535.2% of the area, about 77% by volume
7 Nov 202533.3% of the area, about 76% by volume
20 Dec 20259.6% of the area, about 73% by volume
19 Jan 202627.6% of the area, about 75% by volume
18 Feb 202624.3% of the area, about 75% by volume
15 Mar 202622.1% of the area, about 75% by volume
24 Apr 202612.7% of the area, about 74% by volume
16 May 202611.7% of the area, about 74% by volume
5 Jun 20267.1% of the area, about 73% by volume
2 Aug 202611.4% of the area, about 74% by volume
1 Sep 202637.7% of the area, about 77% by volume
11 Oct 202634.8% of the area, about 77% by volume
10 Nov 202634.4% of the area, about 77% by volume
How we estimate % full by volume from space

For each month with a clear view we take the edge of the water seen by Sentinel-2 and read the height of the ground there from the Copernicus elevation model (GLO-30, 30 m). Heights against areas give the dam’s area-to-height curve, fitted as a smooth curve that only rises. The water held between two levels is the area added up over the height between them. Starting from full, with the full-supply capacity in our dam-levels records (7.8 million m³), the water lost down to a month’s level gives that month’s % full by volume. We show it only where the months spread over enough levels and the curve fits well (R² 0.8 or more); otherwise we say “not enough range yet”. The elevation model was made from radar passes in 2010 to 2015 and shows each lake as a flat surface at its level then, so below that level it has no heights: for many dams only the months near full can be used. This dam: 11 months fitted, R² 0.98, typical miss 0.01 km², shoreline heights 562.2 m to 575.0 m. An estimate, not a measurement: it can be several points off, and DWS’s figure comes from gauged levels.

Produced using Copernicus WorldDEM-30 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-30.

Roode Els Berg Dam from space on 2004 (Landsat, whole year) Roode Els Berg Dam from space on 10 Nov 2026 2004 (Landsat, whole year)10 Nov 2026
Contains modified Copernicus Sentinel data 2026. Landsat imagery courtesy of the U.S. Geological Survey; Digital Earth Africa (CC BY 4.0), modified. True colour, the same frame each time. The earlier picture is from 2004, the year with the least water seen from space since 1986 (18.0% of full on average; Landsat’s cloud-free picture of the whole year).

One picture a year

Contains modified Copernicus Sentinel data 2017-2026. Landsat imagery courtesy of the U.S. Geological Survey; Digital Earth Africa (CC BY 4.0), modified. Before 2017 Landsat’s cloud-free picture of the whole year; from 2017 the clearest Sentinel-2 picture of the same season each year. Choose a picture to see it large.

Roode Els Berg Dam: water seen from space and DWS’s level

Water area from space (% of the full footprint)DWS level (% of full supply volume)

The chart needs JavaScript.

The clearest picture of each month. Area is not volume: a dam’s sides slope, so its area falls more slowly than its volume. DWS: the department’s weekly State of Dams. Contains modified Copernicus Sentinel data 2017-2026.

Roode Els Berg Dam: water seen from space a year at a time, since 1984

Landsat, the year’s average (% of the full outline)Sentinel-2, the months’ average

The chart needs JavaScript.

Landsat imagery courtesy of the U.S. Geological Survey; Digital Earth Africa (CC BY 4.0), modified. Contains modified Copernicus Sentinel data 2017-2026. Digital Earth Africa’s Water Observations from Space: each 30 m pixel inside the outline counted by the share of the year’s clear Landsat looks that saw water. Years with too few clear looks are left out. The least water: 2004, 18.0% of full.
How we estimate % full from space, and how well it does for Roode Els Berg Dam
  • No calibrated estimate yet: nine in ten held-out weeks were within 39 points, wider than the 15 we accept.
  • The footprint. 0.4 km² from Digital Earth Africa’s 40 years of water against 0.4 km² in OpenStreetMap’s outline; they overlap 97% (shared area over the area of either); 0.0 km² is in the footprint only and 0.0 km² in the outline only. 0.2 km² inside the outline that Landsat never saw clearly (steep slopes, shadow) is counted in.
  • Each reading. A month is used when at most 5% of the footprint is under cloud or has no data: in the 117 months used, a median of 100.0% of it was clear (the worst 97.0%).
  • Shoreline pixels. A 20 m pixel at the edge is partly water and partly land; it counts as water when the satellite’s classification says water, else not at all. In a typical month 59.1% of the water area is such edge pixels; half of that is the most the edge can move the area either way.
  • Water outside the footprint. In 11 months we saw water just outside it (within 500 m). It is not counted in the dam’s area: it may be a flood, the footprint may be too small there, or it may be a river or pond nearby.

Area is turned into % full by volume on this dam’s own curve, so the estimate is ours, not DWS’s. It can be off where the water’s edge is hard to see (shallow, muddy or weedy margins) or at levels the curve hasn’t seen. Where DWS and the estimate differ by more than the band, the page says so, without saying which is right.

How we measure a dam from space

Every month since January 2017 the European Space Agency’s Sentinel-2 satellites have pictured it; we measure the water in the clearest picture of each month. Before that, the Landsat satellites, through Digital Earth Africa, give a picture and the water a year since 1984.

Over the year to the newest DWS report, DWS’s level moved down 5.5 points and the water area seen from space down 2.3 points of full.

The chart counts the pixels of Sentinel-2’s water class at 20 m in the clearest scene of each month (at most 5% of the dam hidden by cloud), inside the dam’s footprint from Digital Earth Africa’s 40 years of water (Digital Earth Africa Water Observations from Space, all-time summary 1984 to 2025 (CC BY 4.0), modified).

Measured from space by Unmapped Dataworks, not by DWS: the water is the satellites’ own water class (Sentinel-2 Level-2A scene classification; for Landsat, Digital Earth Africa’s Water Observations from Space) inside the dam’s footprint widened by 40 m: the ground Digital Earth Africa saw under water in at least 10% of its clear Landsat looks from 1984 to 2025, joined to the dam (0.4 km²; OpenStreetMap’s outline, which we use for the dam’s name and place, covers 0.4 km²; Landsat’s yearly water is still measured in OpenStreetMap’s outline), so shallow or muddy edges, floating plants and shadow can count wrong. 117 of 119 months had a clear view. Footprint: Digital Earth Africa Water Observations from Space, all-time summary 1984 to 2025 (CC BY 4.0), modified. The outline is OpenStreetMap’s (© OpenStreetMap contributors, ODbL; the outlines and how we match them). Pictures: Copernicus Sentinel data, free, full and open; Landsat courtesy of the U.S. Geological Survey, through Digital Earth Africa (CC BY 4.0).

Unmapped Dataworks