Notices·Regulator’s decision·4 May 2026

Decision and Reasons for Decision, Thabazimbi, FY2026/27

Issued by the National Energy Regulator of South Africa, dated 4 May 2026.

01

What it is

Kind

Regulator’s decision

NERSA file 9168.

Issued by

National Energy Regulator of South Africa

Used for

Electricity tariffs

15 records in our data are built from it.

02

Every figure it set

82 figures, each as the document prints it, with the page it is on where the document has pages. Grouped by the record built from it.

Thabazimbi: 1.1 Domestic prepaidfinancial year 2026/27

Record za-lim361-1-1-domestic-prepaid-2026-27 · Thabazimbi

Thabazimbi: 1.2 Domestic conventionalfinancial year 2026/27

Record za-lim361-1-2-domestic-conventional-2026-27 · Thabazimbi

Thabazimbi: 1.4 Domestic non-IBT, high (above 400 kWh)financial year 2026/27

Record za-lim361-1-4-domestic-non-ibt-high-above-400-kwh-2026-27 · Thabazimbi

Thabazimbi: 2.2 Prepaid, up to 40 A (single and three phase)financial year 2026/27

Record za-lim361-2-2-prepaid-up-to-40-a-single-and-three-phase-2026-27 · Thabazimbi

Thabazimbi: 2.5 Prepaid, 40 A and above (single and three phase)financial year 2026/27

Record za-lim361-2-5-prepaid-40-a-and-above-single-and-three-phase-2026-27 · Thabazimbi

Thabazimbi: 2.6 Prepaid, up to 100 A (single and three phase)financial year 2026/27

Record za-lim361-2-6-prepaid-up-to-100-a-single-and-three-phase-2026-27 · Thabazimbi

Thabazimbi: 3.1 A) Industrial 1, low voltage, more than 125 A to 250 Afinancial year 2026/27

Record za-lim361-3-1-a-industrial-1-low-voltage-more-than-125-a-to-250-a-2026-27 · Thabazimbi

Thabazimbi: 3.2 A) Industrial 2, high voltage, 300 A and abovefinancial year 2026/27

Record za-lim361-3-2-a-industrial-2-high-voltage-300-a-and-above-2026-27 · Thabazimbi

Thabazimbi: 3.2 B) Alternative industrial 2, high voltage, 300 A and abovefinancial year 2026/27

Record za-lim361-3-2-b-alternative-industrial-2-high-voltage-300-a-and-above-2026-27 · Thabazimbi

Thabazimbi: 3.2 b) Alternative industrial 1, low voltage, more than 125 A to 250 Afinancial year 2026/27

Record za-lim361-3-2-b-alternative-industrial-1-low-voltage-more-than-125-a-to-250-a-2026-27 · Thabazimbi

Thabazimbi: 3.3 Industrial, high voltagefinancial year 2026/27

Record za-lim361-3-3-industrial-high-voltage-2026-27 · Thabazimbi

03

The document

The file our figures were read from. The copy shown here has some pages withheld, so there are two fingerprints below: the copy’s and the original’s.

Check it yourself

SHA-256 of the copy we showa1d4e9a3f5ec96f3fb4d196b523fc8c40b8b09f0a307a9c863952c592798b187

SHA-256 of the original, kept and not shown60778039b683edfa6391b024fc81c021ba5a7c0e516fe916c7418d819705de83

  1. Download our copy with the link above. 1 page of it is replaced by a note, because the original’s names members of the public.
  2. Work out the file’s fingerprint. Mac or Linux: shasum -a 256 the-file.pdf. Windows: certutil -hashfile the-file.pdf SHA256.
  3. It should give the first fingerprint above: the copy’s own.
  4. The second is the file as we fetched it from the publisher. A copy from the publisher’s own site gives it only if they have not changed their file since.

A fingerprint shows a file has not changed. It is not encryption. How this works

04

Where its figures are used

Electricity tariffsEvery releaseEvery notice

How to read this page

  1. Every figure is as the document prints it, with the page it is on where the document has pages.
  2. A date links to its own page, with everything else that changed that day.
  3. Old figures are kept, never overwritten. A notice page lists what the notice set, even after a later one replaced it.
  4. Hatching means we hold no copy. Such a source is cited only, and its page says so.