Overstrand: 1. Lifeline two-part tariff (prepaid meters only), up to 30 Afinancial year 2026/27
- Basic chargeR130.34 a monthFrom 1 Jul 2026, still in force · page 19
- Basic chargeR108.62 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 19
- Capacity chargeR197.28 a monthFrom 1 Jul 2026, still in force · page 19
- Capacity chargeR164.40 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 19
- Energy, block 1 (0 to 350 kWh)250.6 c/kWhFrom 1 Jul 2026, still in force · page 19
- Energy, block 1 (0 to 350 kWh)223.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 19
- Energy, block 2 (350 to 600 kWh)280.28 c/kWhFrom 1 Jul 2026, still in force · page 19
- Energy, block 2 (350 to 600 kWh)277.9 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 19
- Energy, block 3 (600 and more kWh)302.87 c/kWhFrom 1 Jul 2026, still in force · page 19
- Energy, block 3 (600 and more kWh)318.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 19
Record za-wc032-1-lifeline-two-part-tariff-prepaid-meters-only-up-to-30-a-2026-27 · Overstrand
Overstrand: 2. Domestic single-phase two-part tariff, 60 A, credit metersfinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)255.52 c/kWhFrom 1 Jul 2026, still in force · page 20
- Energy, block 1 (0 to 350 kWh)232.91 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 20
- Energy, block 2 (350 to 600 kWh)285.73 c/kWhFrom 1 Jul 2026, still in force · page 20
- Energy, block 2 (350 to 600 kWh)287.82 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 20
- Energy, block 3 (600 and more kWh)307.38 c/kWhFrom 1 Jul 2026, still in force · page 20
- Energy, block 3 (600 and more kWh)327.17 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 20
- Basic chargeR420.78 a monthFrom 1 Jul 2026, still in force · page 20
- Basic chargeR413.97 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 20
- Capacity chargeR394.56 a monthFrom 1 Jul 2026, still in force · page 20
- Capacity chargeR328.80 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 20
Record za-wc032-2-domestic-single-phase-two-part-tariff-60-a-credit-meters-2026-27 · Overstrand
Overstrand: 3. Domestic single-phase two-part tariff, prepaid, 30 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)250.6 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 1 (0 to 350 kWh)223.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 2 (350 to 600 kWh)280.28 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 2 (350 to 600 kWh)277.9 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 3 (600 and more kWh)302.87 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 3 (600 and more kWh)318.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Capacity chargeR197.28 a monthFrom 1 Jul 2026, still in force · page 21
- Capacity chargeR164.40 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Basic chargeR420.78 a monthFrom 1 Jul 2026, still in force · page 21
- Basic chargeR413.97 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
Record za-wc032-3-domestic-single-phase-two-part-tariff-prepaid-30-a-2026-27 · Overstrand
Overstrand: 3. Domestic single-phase two-part tariff, prepaid, 40 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)250.6 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 1 (0 to 350 kWh)223.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 2 (350 to 600 kWh)280.28 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 2 (350 to 600 kWh)277.9 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 3 (600 and more kWh)302.87 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 3 (600 and more kWh)318.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Capacity chargeR263.04 a monthFrom 1 Jul 2026, still in force · page 21
- Capacity chargeR219.20 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Basic chargeR420.78 a monthFrom 1 Jul 2026, still in force · page 21
- Basic chargeR413.97 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
Record za-wc032-3-domestic-single-phase-two-part-tariff-prepaid-40-a-2026-27 · Overstrand
Overstrand: 3. Domestic single-phase two-part tariff, prepaid, 50 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)250.6 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 1 (0 to 350 kWh)223.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 2 (350 to 600 kWh)280.28 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 2 (350 to 600 kWh)277.9 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 3 (600 and more kWh)302.87 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 3 (600 and more kWh)318.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Capacity chargeR328.80 a monthFrom 1 Jul 2026, still in force · page 21
- Capacity chargeR274 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Basic chargeR420.78 a monthFrom 1 Jul 2026, still in force · page 21
- Basic chargeR413.97 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
Record za-wc032-3-domestic-single-phase-two-part-tariff-prepaid-50-a-2026-27 · Overstrand
Overstrand: 3. Domestic single-phase two-part tariff, prepaid, 60 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)250.6 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 1 (0 to 350 kWh)223.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 2 (350 to 600 kWh)280.28 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 2 (350 to 600 kWh)277.9 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Energy, block 3 (600 and more kWh)302.87 c/kWhFrom 1 Jul 2026, still in force · page 21
- Energy, block 3 (600 and more kWh)318.97 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Capacity chargeR394.56 a monthFrom 1 Jul 2026, still in force · page 21
- Capacity chargeR328.80 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
- Basic chargeR420.78 a monthFrom 1 Jul 2026, still in force · page 21
- Basic chargeR413.97 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 21
Record za-wc032-3-domestic-single-phase-two-part-tariff-prepaid-60-a-2026-27 · Overstrand
Overstrand: 4. Domestic three-phase two-part tariff, credit, 100 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)256.13 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 1 (0 to 350 kWh)225.76 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 2 (350 to 600 kWh)286.12 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 2 (350 to 600 kWh)288.53 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 3 (600 and more kWh)306.66 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 3 (600 and more kWh)325.86 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 22
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Capacity chargeR1,972.80 a monthFrom 1 Jul 2026, still in force · page 22
- Capacity chargeR1,644 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
Record za-wc032-4-domestic-three-phase-two-part-tariff-credit-100-a-2026-27 · Overstrand
Overstrand: 4. Domestic three-phase two-part tariff, credit, 40 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)256.13 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 1 (0 to 350 kWh)225.76 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 2 (350 to 600 kWh)286.12 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 2 (350 to 600 kWh)288.53 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 3 (600 and more kWh)306.66 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 3 (600 and more kWh)325.86 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 22
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Capacity chargeR789.12 a monthFrom 1 Jul 2026, still in force · page 22
- Capacity chargeR657.60 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
Record za-wc032-4-domestic-three-phase-two-part-tariff-credit-40-a-2026-27 · Overstrand
Overstrand: 4. Domestic three-phase two-part tariff, credit, 60 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)256.13 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 1 (0 to 350 kWh)225.76 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 2 (350 to 600 kWh)286.12 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 2 (350 to 600 kWh)288.53 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 3 (600 and more kWh)306.66 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 3 (600 and more kWh)325.86 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 22
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Capacity chargeR1,183.68 a monthFrom 1 Jul 2026, still in force · page 22
- Capacity chargeR986.40 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
Record za-wc032-4-domestic-three-phase-two-part-tariff-credit-60-a-2026-27 · Overstrand
Overstrand: 4. Domestic three-phase two-part tariff, credit, 80 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)256.13 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 1 (0 to 350 kWh)225.76 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 2 (350 to 600 kWh)286.12 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 2 (350 to 600 kWh)288.53 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Energy, block 3 (600 and more kWh)306.66 c/kWhFrom 1 Jul 2026, still in force · page 22
- Energy, block 3 (600 and more kWh)325.86 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 22
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
- Capacity chargeR1,578.24 a monthFrom 1 Jul 2026, still in force · page 22
- Capacity chargeR1,315.20 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 22
Record za-wc032-4-domestic-three-phase-two-part-tariff-credit-80-a-2026-27 · Overstrand
Overstrand: 5. Domestic three-phase two-part tariff, prepaid, 100 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)251.17 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 1 (0 to 350 kWh)225 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 2 (350 to 600 kWh)280.64 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 2 (350 to 600 kWh)278.57 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 3 (600 and more kWh)302.18 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 3 (600 and more kWh)317.71 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 23
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Capacity chargeR1,972.80 a monthFrom 1 Jul 2026, still in force · page 23
- Capacity chargeR1,644 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
Record za-wc032-5-domestic-three-phase-two-part-tariff-prepaid-100-a-2026-27 · Overstrand
Overstrand: 5. Domestic three-phase two-part tariff, prepaid, 40 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)251.17 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 1 (0 to 350 kWh)225 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 2 (350 to 600 kWh)280.64 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 2 (350 to 600 kWh)278.57 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 3 (600 and more kWh)302.18 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 3 (600 and more kWh)317.71 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 23
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Capacity chargeR789.12 a monthFrom 1 Jul 2026, still in force · page 23
- Capacity chargeR657.60 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
Record za-wc032-5-domestic-three-phase-two-part-tariff-prepaid-40-a-2026-27 · Overstrand
Overstrand: 5. Domestic three-phase two-part tariff, prepaid, 60 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)251.17 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 1 (0 to 350 kWh)225 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 2 (350 to 600 kWh)280.64 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 2 (350 to 600 kWh)278.57 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 3 (600 and more kWh)302.18 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 3 (600 and more kWh)317.71 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 23
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Capacity chargeR1,183.68 a monthFrom 1 Jul 2026, still in force · page 23
- Capacity chargeR986.40 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
Record za-wc032-5-domestic-three-phase-two-part-tariff-prepaid-60-a-2026-27 · Overstrand
Overstrand: 5. Domestic three-phase two-part tariff, prepaid, 80 Afinancial year 2026/27
- Energy, block 1 (0 to 350 kWh)251.17 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 1 (0 to 350 kWh)225 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 2 (350 to 600 kWh)280.64 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 2 (350 to 600 kWh)278.57 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Energy, block 3 (600 and more kWh)302.18 c/kWhFrom 1 Jul 2026, still in force · page 23
- Energy, block 3 (600 and more kWh)317.71 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Basic chargeR754.69 a monthFrom 1 Jul 2026, still in force · page 23
- Basic chargeR742.44 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
- Capacity chargeR1,578.24 a monthFrom 1 Jul 2026, still in force · page 23
- Capacity chargeR1,315.20 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 23
Record za-wc032-5-domestic-three-phase-two-part-tariff-prepaid-80-a-2026-27 · Overstrand
Overstrand: 10. Commercial three-phase two-part tariff, prepaid, 100 Afinancial year 2026/27
Record za-wc032-10-commercial-three-phase-two-part-tariff-prepaid-100-a-2026-27 · Overstrand
Overstrand: 10. Commercial three-phase two-part tariff, prepaid, 40 Afinancial year 2026/27
Record za-wc032-10-commercial-three-phase-two-part-tariff-prepaid-40-a-2026-27 · Overstrand
Overstrand: 10. Commercial three-phase two-part tariff, prepaid, 60 Afinancial year 2026/27
Record za-wc032-10-commercial-three-phase-two-part-tariff-prepaid-60-a-2026-27 · Overstrand
Overstrand: 10. Commercial three-phase two-part tariff, prepaid, 80 Afinancial year 2026/27
Record za-wc032-10-commercial-three-phase-two-part-tariff-prepaid-80-a-2026-27 · Overstrand
Overstrand: 11. Businesses, flats, sportsgrounds and churches (minimum 800 kWh a month, averaged over 12 months), 100 Afinancial year 2026/27
Record za-wc032-11-businesses-flats-sportsgrounds-and-churches-minimum-800-kwh-a-month-averaged-over-12-months-100-a-2026-27 · Overstrand
Overstrand: 11. Businesses, flats, sportsgrounds and churches (minimum 800 kWh a month, averaged over 12 months), 40 Afinancial year 2026/27
Record za-wc032-11-businesses-flats-sportsgrounds-and-churches-minimum-800-kwh-a-month-averaged-over-12-months-40-a-2026-27 · Overstrand
Overstrand: 11. Businesses, flats, sportsgrounds and churches (minimum 800 kWh a month, averaged over 12 months), 60 Afinancial year 2026/27
Record za-wc032-11-businesses-flats-sportsgrounds-and-churches-minimum-800-kwh-a-month-averaged-over-12-months-60-a-2026-27 · Overstrand
Overstrand: 11. Businesses, flats, sportsgrounds and churches (minimum 800 kWh a month, averaged over 12 months), 80 Afinancial year 2026/27
Record za-wc032-11-businesses-flats-sportsgrounds-and-churches-minimum-800-kwh-a-month-averaged-over-12-months-80-a-2026-27 · Overstrand
Overstrand: 17. TOU tariff, small customer (below 100 kVA)financial year 2026/27
- Basic chargeR507.88 a monthFrom 1 Jul 2026, still in force · page 35
- Basic chargeR468.09 a monthFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Capacity charge68.29 R/kVA/monthFrom 1 Jul 2026, still in force · page 35
- Capacity charge62.94 R/kVA/monthFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Reactive0.2562 R/kvarhFrom 1 Jul 2026, still in force · page 35
- Reactive0.2361 R/kvarhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, low demand, peak299.84 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, low demand, peak276.35 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, low demand, standard223.69 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, low demand, standard206.17 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, low demand, off peak162.2 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, low demand, off peak149.49 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, high demand, peak804.49 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, high demand, peak741.46 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, high demand, standard282.43 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, high demand, standard260.3 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
- Energy tou, high demand, off peak178.79 c/kWhFrom 1 Jul 2026, still in force · page 35
- Energy tou, high demand, off peak164.78 c/kWhFrom 1 Jul 2025 to 1 Jul 2026 · page 35
Record za-wc032-17-tou-tariff-small-customer-below-100-kva-2026-27 · Overstrand
Overstrand: 6. Two-part tariff (prepaid meters only): local economic development projects, 30 Afinancial year 2026/27
Record za-wc032-6-two-part-tariff-prepaid-meters-only-local-economic-development-projects-30-a-2026-27 · Overstrand
Overstrand: 6. Two-part tariff (prepaid meters only): local economic development projects, 40 Afinancial year 2026/27
Record za-wc032-6-two-part-tariff-prepaid-meters-only-local-economic-development-projects-40-a-2026-27 · Overstrand
Overstrand: 6. Two-part tariff (prepaid meters only): local economic development projects, 50 Afinancial year 2026/27
Record za-wc032-6-two-part-tariff-prepaid-meters-only-local-economic-development-projects-50-a-2026-27 · Overstrand
Overstrand: 6. Two-part tariff (prepaid meters only): local economic development projects, 60 Afinancial year 2026/27
Record za-wc032-6-two-part-tariff-prepaid-meters-only-local-economic-development-projects-60-a-2026-27 · Overstrand
Overstrand: 7. Commercial single-phase, credit meter, 30 Afinancial year 2026/27
Record za-wc032-7-commercial-single-phase-credit-meter-30-a-2026-27 · Overstrand