Decision and Reasons for Decision, Mogalakwena, FY2026/27

Issued by the National Energy Regulator of South Africa, dated 11 May 2026.

01

What it is

Kind

Regulator’s decision

NERSA file 9264.

Issued by

National Energy Regulator of South Africa

Used for

Electricity tariffs

9 records in our data are built from it.

02

Every figure it set

88 figures, each as the document prints it, with the page it is on where the document has pages. Grouped by the record built from it.

Mogalakwena: 1.1 Domestic prepaid, flat rate (no inclining blocks)financial year 2026/27

Record za-lim367-1-1-domestic-prepaid-flat-rate-no-inclining-blocks-2026-27 · Mogalakwena

Mogalakwena: 1.2 Domestic conventionalfinancial year 2026/27

Record za-lim367-1-2-domestic-conventional-2026-27 · Mogalakwena

Mogalakwena: 3.2 Commercial prepaidfinancial year 2026/27

Record za-lim367-3-2-commercial-prepaid-2026-27 · Mogalakwena

Mogalakwena: 4.1 Industrial high voltagefinancial year 2026/27

Record za-lim367-4-1-industrial-high-voltage-2026-27 · Mogalakwena

Mogalakwena: 4.2 Industrial high voltage (second table)financial year 2026/27

Record za-lim367-4-2-industrial-high-voltage-second-table-2026-27 · Mogalakwena

Mogalakwena: 4.3 Industrial high voltage, time of usefinancial year 2026/27

Record za-lim367-4-3-industrial-high-voltage-time-of-use-2026-27 · Mogalakwena

Mogalakwena: 4.4 Industrial low voltage, time of usefinancial year 2026/27

Record za-lim367-4-4-industrial-low-voltage-time-of-use-2026-27 · Mogalakwena

Figures other records are worked out from

  • Mogalakwena: 3.2 Commercial prepaid: capacity-r-pod-day35 R/POD/dayFrom 1 Jul 2026, still in force · page 23
  • Mogalakwena: 4.1 Industrial high voltage: capacity-r-kva-month3.49 R/kVA/monthFrom 1 Jul 2026, still in force · page 24
  • Mogalakwena: 4.2 Industrial high voltage (second table): capacity-r-kva-month0.349 R/kVA/monthFrom 1 Jul 2026, still in force · page 25
  • Mogalakwena: 4.3 Industrial high voltage, time of use: capacity-r-kva-month3.49 R/kVA/monthFrom 1 Jul 2026, still in force · page 26
  • Mogalakwena: 4.4 Industrial low voltage, time of use: capacity-r-kva-month3.49 R/kVA/monthFrom 1 Jul 2026, still in force · page 27

03

The document

The file our figures were read from. The copy shown here has some pages withheld, so there are two fingerprints below: the copy’s and the original’s.

Check it yourself

SHA-256 of the copy we show934ae46c387f1a9e15c4d4b6044509ec8f7f7abb76b55155d396f0e6d126cc76

SHA-256 of the original, kept and not shownff25018b3f0cb12ccd334332a3c24aa8e9c61ce41d81533ffe7e69e5ec8f3e53

  1. Download our copy with the link above. 2 pages of it are replaced by a note, because the original’s name members of the public.
  2. Work out the file’s fingerprint. Mac or Linux: shasum -a 256 the-file.pdf. Windows: certutil -hashfile the-file.pdf SHA256.
  3. It should give the first fingerprint above: the copy’s own.
  4. The second is the file as we fetched it from the publisher. A copy from the publisher’s own site gives it only if they have not changed their file since.

A fingerprint shows a file has not changed. It is not encryption. How this works

04

Where its figures are used

Electricity tariffsEvery releaseEvery notice

How to read this page

  1. Every figure is as the document prints it, with the page it is on where the document has pages.
  2. A date links to its own page, with everything else that changed that day.
  3. Old figures are kept, never overwritten. A notice page lists what the notice set, even after a later one replaced it.
  4. Hatching means we hold no copy. Such a source is cited only, and its page says so.

Every notice and decision